Production Space Optimization – Integrated Sheet Metal Storage and Handling System

How an all-in-one cassette rack, pillar jib crane, and vacuum lifter were integrated into a single compact unit — eliminating dead zones and improving Overall Equipment Effectiveness in a metalworking facility.

Sheet MetalStorage RacksJib CraneVacuum Lifter
Integrated cassette rack with jib crane and vacuum lifter — DS System metalworking facility
Integrated DS System unit: cassette rack + pillar jib crane + vacuum lifter in a metalworking facility.

The Operational Challenge

In modern metalworking facilities, the available operational footprint around CNC machinery — such as laser or plasma cutters — is frequently limited. Storing large-format sheet metal and transporting it safely to the machine's cutting table traditionally requires significant floor space.

The primary technical constraints in such environments include:

  • Pillar jib crane installation requires a dedicated concrete foundation, often impossible in constrained production layouts.
  • Multiple operators or a forklift are required to load individual metal sheets onto the CNC processing machine.
  • Mechanical transport carries an inherent risk of surface damage or deformation to the sheet metal.
CNC laser cutting machine on a constrained production floor — space optimization challenge
Typical metalworking facility floor plan: limited space around CNC laser cutting machines.

The DS System Technical Solution

To resolve the spatial limitations, an integrated "all-in-one" solution was engineered, combining three distinct material handling units into a single, compact logistical hub.

The custom system consists of the following components:

Cassette Rack

Constructed from reinforced steel profiles, this unit enables high-density, multi-level storage of sheet metal. Pull-out drawers provide immediate access to specific material batches.

Integrated Pillar Jib Crane

Rather than anchoring to the facility floor, the crane's rotational column was engineered to mount directly onto the structural frame of the cassette rack. The rack's framework was specifically calculated to withstand both the static and dynamic loads generated by the active crane.

Vacuum Lifter

Suspended from the crane's hoist, this heavy-duty vacuum lifter is equipped with an adjustable suction pad system, specifically calibrated for handling smooth, dense metal surfaces.

Technical Implementation and Workflow

Integrating the jib crane directly into the storage rack effectively eliminates operational "dead zones" within the production area. The handling process has been fully optimized for a single operator.
  1. 1The operator manually extends the designated cassette drawer containing the required sheet metal.
  2. 2Using the crane's jib arm, the vacuum lifter is positioned directly above the material.
  3. 3Utilizing vacuum technology, the sheet is instantly secured without any risk of surface scratching or mechanical distortion.
  4. 4Controlled via the hoist pendant, the operator lifts the load and uses the rotational arm to transfer the sheet metal directly onto the adjacent CNC cutting table.
Operator using the DS System vacuum lifter and jib crane to load sheet metal onto a CNC laser cutter
Single-operator workflow: from cassette drawer to CNC cutting table in under 60 seconds.

Operational Impact

The implementation of the DS System integrated handling unit yielded measurable engineering and organizational improvements:

Footprint Reduction

Utilizing the storage rack as the structural foundation for the jib crane reclaimed valuable floor space, allowing for a higher density of production machinery.

Ergonomics & Safety

The system completely eliminated manual lifting of heavy loads and reduced hazardous forklift traffic in narrow production aisles.

OEE Improvement

Decreasing machine loading time minimizes idle time of the laser cutter, directly improving the Overall Equipment Effectiveness of the production cell.

Completed DS System installation — cassette rack with crane and vacuum lifter in a metalworking production cell
Finished installation: the complete production cell with integrated DS System material handling.

Need a similar system for your facility?

Our engineers will design an integrated material handling solution matched to your production layout and material specifications.